Dr. Paul Borosky, DBA, MBA
Construction Guide · Bidding
How to Bid a Construction Job Without Underbidding
Most contractors do not lose money on the work. They lose it on the bid, before the first nail goes in. This page shows what a bid has to carry, how to price it, and how to stop leaving money on the table. Part of the construction business guide.
Need help now? Call or text (321) 948-9588. Dr. Paul answers personally.
Last Updated: 10/27/2026 · Written by Dr. Paul Borosky, DBA, MBA
The Short Answer
What Is a Construction Bid?
Textbook Definition
A construction bid is a written offer to complete a defined scope of work for a stated price. The price must cover direct job costs, a share of company overhead, and a profit.
In Plain English
A bid is your price for a job. A good one pays for the job, pays to keep your company open, and leaves something for you. Most underbids forget the second and third parts.
Why It Matters
Why Do So Many Contractors Underbid?
Profit in construction is thin. In the National Association of Home Builders (NAHB) 2026 study of remodelers, which covers 2024, the average company kept a net profit of 6.3%. That was up from 4.7% in 2021. Gross profit was 29.9%, and operating costs took 23.6% of sales. Source: NAHB Eye on Housing.
Here is what that means in dollars. On $1,000,000 of sales, 6.3% is $63,000. If your estimates miss by just 5%, that is $50,000. Most of the profit is gone. The study covers remodelers only, so your numbers will differ, but the lesson holds for every trade: a small miss in the bid is a big hit to the profit.
Underbidding is rarely one big mistake. It is a handful of small things left out: a second dumpster, the permit fee, the extra trip to the supply house, and the cost of keeping your own company running. This is Failure #1 in the book.
Signs your bids are leaking:
- You win most of the bids you send, and the wins do not feel profitable.
- You build the price from the last job’s number, not this job’s costs.
- Nobody on your team can tell you your overhead rate.
- You add a flat 20% to cost and call all of it profit.
- Change orders end up paying for mistakes in the original bid.
- You finish jobs and never compare the bid to what the job really cost.
What It Looks Like
What an Underbid Looks Like
From the book · Failure #1 · A fictional example
Danny Pruitt runs Shiny Nail Remodeling. He wins a big kitchen over two established companies and tells his wife and bookkeeper, Carla, that night. Carla asks one question: “How much are we making on it?” Danny says, “Enough.” He believes it.
His number never included the two dumpsters, the permit and inspection fees, the plumber who had to move the sink and needed a day and a half longer because the slab had to be cut, the electrician for new circuits, or the three trips to the supply house. It also held nothing for Shiny Nail itself: the truck, the insurance, the phone, the software, Carla’s hours, or the eleven hours Danny spent on the phone with the homeowners and the cabinet supplier.
Danny and Carla are fictional characters in Top 5 Reasons Construction Companies Fail. The pattern is real.
The Fix
How to Bid a Construction Job in 8 Steps
Use the same steps on every bid, big or small. The routine is what protects you when you are busy and a customer is pushing on price.
Know your overhead rate first.
Overhead is what it costs to keep the company open when no job is running. Add it up for a year, divide it by a base such as direct job costs, and you have a rate. Our overhead rate guide shows how. Until you have this number, every bid is a guess.
Walk the job and write the scope.
Say what is included and what is not. Take photos and measurements. A clear scope is the best defense against the customer who assumes more is included than you priced.
Price every cost bucket.
Use the same buckets every time: labor with its payroll costs, materials with waste, subcontractors, equipment and rentals, permits and fees, dumpsters and disposal, and a small contingency. Get written quotes from subs, and check them with our subcontractor guide.
Add your share of overhead.
Multiply your direct costs by your overhead rate. This is the step Danny skipped. It is not extra profit. It is the cost of being in business.
Add profit using margin, not markup.
Markup is a percent added to cost. Margin is the percent of the price you actually keep. They are not the same number. The table below shows the difference.
Set a walk-away number.
Decide the lowest price you will accept before you send the bid, and write it on the bid sheet. When a customer pushes, you already know your answer. Passing on a bad job is a business decision, not a loss.
Write down assumptions and terms.
List the exclusions, how long the price holds, the payment schedule, and how extras are handled. Put retainage terms and your change order process in writing before you sign.
Compare the bid to the actual cost.
When the job closes, put the estimate next to what the job really cost, line by line. Use what you learn on the next bid. Job costing makes this possible while the job is still running.
Dr. Paul’s Insight
The lowest bid wins the job. It does not win the money. Dr. Paul sees the same pattern with contractors again and again: the ones who last are not the cheapest. They know their numbers well enough to say no. Fix the bid and half of the cash problems in the cash gap guide never start.
The Math That Trips Owners
Markup Versus Margin: Why 20% Is Not 20%
This is the most common pricing mistake in the trades. A markup of 20% does not leave you a margin of 20%.
| Pricing method | How it works | Price on $100,000 cost | Profit | Margin you keep |
|---|---|---|---|---|
| 20% markup | Cost × 1.20 | $120,000 | $20,000 | 16.7% |
| 20% margin | Cost ÷ 0.80 | $125,000 | $25,000 | 20.0% |
To change a margin into a markup, divide the margin by one minus the margin. A 20% margin equals a 25% markup. The math is simple arithmetic, not a sourced statistic.
Bid Sheet
A Bid Checklist You Can Use Today
This is a practical working checklist, not an industry standard. Edit it for your trade.
- Scope written, with exclusions and photos.
- Labor priced with payroll costs added, not just wages.
- Materials priced with waste and delivery.
- Subs quoted in writing, license and insurance checked.
- Equipment and rentals priced for the real number of days.
- Permits, fees, dumpsters, and disposal included.
- Contingency added for the unknowns you can name.
- Overhead added using your rate.
- Profit added as a margin, and the walk-away number written down.
- Terms written: payment schedule, retainage, change orders, how long the price holds.
Want these numbers in a spreadsheet? The construction business plan template includes an Excel model with editable bids, job costing, labor, and equipment.
Work With Dr. Paul
Three Ways Dr. Paul Helps Construction Owners
Read the page and fix it yourself, or get help. Here is where each option fits.
Business Consulting
For owners stuck in the cash gap, bidding blind, or running every job themselves. Dr. Paul works with you on bids, cash flow, job costing, and getting you off the jobsite.
See consulting and prices →Business Plan Writing
For contractors applying for a loan, a line of credit, a bigger bond, or an expansion. Dr. Paul writes the plan and the financial projections for you.
Construction business plan writer →Business Plan Template
For owners who want to build it themselves. A construction-specific Word plan plus an Excel model with editable bids, job costing, labor, and equipment.
Get the construction template →FAQ
Bidding Questions
How do you price a construction job?
What is a good profit margin for a contractor?
What is the difference between markup and margin?
Should I always bid the lowest price?
What should a bid include besides the price?
Start with the book. Call when you want a second set of eyes on a bid.
Keep Going
Related Construction Guides
A good bid connects to everything else in the business. These guides cover the next steps.
Construction Job Costing
Cost codes, weekly tracking, and a worked example of estimate versus actual.
Overhead Rate
The formula, the base choice, and a worked example.
What Is Retainage in Construction?
How the holdback works, who can hold how much, and how to collect it faster.
How to Write a Change Order
Six steps, a one-page sample, a script, and the Florida lien clock.
Competing With Bigger Contractors
The too-low test, what to sell besides price, and how to pick a lane.
Gross Margin vs. Net Margin
The two margins every bid has to hit, explained in plain English.
Sources
Where These Numbers and Rules Come From
Every figure on this page comes from a source below. Dollar examples labeled as examples are illustrations, not projections for your business.
- NAHB Eye on Housing: Remodelers Saw Profit Margin Gains in 2024 (Apr 8, 2026) Remodelers only, 2024 data, 2026 edition.
- NAHB: Home Remodeling Profit Margin (Apr 10, 2026) Confirms the margins above.
- Top 5 Reasons Construction Companies Fail, and 5 Reasons They Succeed: Construction Edition, by Dr. Paul Borosky Failure #1 and the Danny story are from the book. Danny, Carla, and Shiny Nail are fictional.
Dr. Paul Borosky, DBA, MBA
Business Consultant, Author & Educator | 14+ Years | 1,000+ Clients Served
Dr. Paul Borosky, DBA, MBA is a business consultant, author, and educator, and the founder of Quality Business Plan. He helps small business owners across the United States and Canada, including contractors and specialty trades, with business planning, financial modeling, fractional CFO services, and the everyday problems of businesses that depend too much on their owners. He is the creator of Dr. Paul’s Organize-Plan-Grow™ Strategy, author of numerous published books on Amazon including Top 5 Reasons Construction Companies Fail, and publisher of over 1,000 business-focused videos on YouTube.
This page is for general educational purposes only. It is not legal, financial, tax, accounting, insurance, or other professional advice. Construction laws, licensing rules, and tax rules vary by state and change over time. Dollar examples are illustrations, not projections for your business. Shiny Nail Remodeling, Square-Up Contractors, and the people in them are fictional. For decisions about your own business, consult a qualified professional.