Dr. Paul Borosky, DBA, MBA
Construction Guide · Competition
How to Compete Against Larger Contractors and Lowball Bids
You will not win by being cheaper than a company with more trucks. You win by being the right fit and by knowing when a low bid is a trap. This page shows how to test a lowball, what to sell besides price, and when to walk away. Part of the construction business guide.
Need help now? Call or text (321) 948-9588. Dr. Paul answers personally.
Last Updated: 10/27/2026 · Written by Dr. Paul Borosky, DBA, MBA
The Short Answer
What Is Competitive Positioning?
Textbook Definition
Competitive positioning is how a company chooses the customers, work, and strengths that set it apart from rivals, so that it can win on more than the lowest price.
In Plain English
You will not beat a big company on size. You beat it on being the better fit: easier to reach, faster to respond, and better at one kind of job.
Why It Matters
Why Does the Lowest Price Not Always Win, and Should You Chase It?
Price is only one thing owners weigh. An informal audience poll at a construction owners’ conference found that 95% of owners said quality and service matter in selection and 89% said they will pay more for them. Among those owners, 36% would pay 1% to 4% more, 36% about 5% more, 18% 10% or more, and 10% would not pay more. A separate vendor survey of builders found 93.7% would pick a high-performing sub over a cheaper one. Both are small, informal samples, so treat them as direction, not proof. Sources: ForConstructionPros; ProcurePro.
Buyers also look at financial strength. The commercial real estate firm CBRE says data center operators are scrutinizing tenant credit, and a software vendor lists financial readiness among what general contractors score in subs. A small contractor with clean books and clear numbers can look stronger than a bigger one with a messy file. See the lender checklist.
The danger is chasing every low number. A bid that wins at a price you cannot sustain is a loss that has not happened yet. See how to bid for how to set your floor.
Signs you are competing the wrong way:
- You lose to bids you cannot explain.
- You cut your price every time a customer pushes.
- You cannot say in one sentence what you are best at.
- You do not track how many bids you win.
- Customers say “too expensive” and you do not ask why.
- You bid work you would not want to build.
The Fix
How to Compete Without Racing to the Bottom
Seven moves, in order. The first two protect you. The rest help you win.
Know your floor.
Set the lowest price that covers costs, overhead, and your minimum profit. Write it on every bid. Our guide to overhead rates and job costing make the number real.
Run the too-low test on the winning bid.
When a rival wins by a wide margin, do not guess. Public agencies use a screen like this: Louisiana’s highway department flags bids that come in more than 25% under its estimate or more than 10% over, and checks whether prices are unbalanced across line items. Ask yourself the same questions about the winner: did they leave out scope, front-load the pricing, or ignore overhead?
Track your win rate.
Count bids submitted and bids won. A study of 303 architecture, engineering, and construction firms found hit rates of 37% to 44%, with construction firms averaging 37.9%. That data is from 2017, so use it only as a rough check, not a target. Your own trend matters more.
Sell what the cheap bid cannot.
Responsiveness, a track record, references, a good safety record, and financial strength are all things a lowball cannot promise. Put them on the first page of every bid.
Pick a lane.
A company known for one kind of job can charge more than a generalist. The data center example shows the pull of specialization: contractors with data center work report 11.3 months of backlog against 8.7 overall. But that work skews to large firms, so test any niche in your own market before you bet on it. See data center construction.
Make it easy to say yes.
Reply fast, give a clear scope, name one point of contact, and offer a firm schedule. Owners do not just hire a price. They hire the person they trust to show up.
Walk away when you need to.
Passing on a bad job is a business decision. The customer you lose is often a customer you could not afford. If one customer is most of your work, read about customer concentration.
Test the Winner
The Too-Low Bid Test
Use these questions when a rival wins by a lot. They are modeled on public-sector bid reviews.
- How far below the estimate? A bid more than 25% under the owner’s estimate is a flag in some public screens.
- Is the pricing balanced? Look for line items that are heavy early and light late, or the reverse.
- Is the scope complete? Compare their scope with yours, line by line.
- Do they have capacity? Check what other work the bidder has on the books.
- Do they have the money? A financial check and references from recent projects show whether they can finish.
- What is their record? Past-project reference calls tell you how they performed.
A North Carolina public-law source describes the same ideas as responsiveness and responsibility, past-project reference calls, a financial check, and capacity against other work. It is from another state, so use it as a model, not as Florida law. Source: UNC School of Government. We did not find a published rule of thumb for the gap between the lowest and second-lowest bid, so this page does not offer one.
Dr. Paul’s Insight
The goal is not to be the cheapest or the biggest. It is to be the contractor an owner can picture finishing the job on time, on budget, and without drama. Show that in your bid, your references, and your numbers. Dr. Paul sees small contractors win again and again when they stop explaining their price and start showing their process. A written plan makes the case to lenders and partners too: see the business plan writer.
Work With Dr. Paul
Three Ways Dr. Paul Helps Construction Owners
Read the page and fix it yourself, or get help. Here is where each option fits.
Business Consulting
For owners stuck in the cash gap, bidding blind, or running every job themselves. Dr. Paul works with you on bids, cash flow, job costing, and getting you off the jobsite.
See consulting and prices →Business Plan Writing
For contractors applying for a loan, a line of credit, a bigger bond, or an expansion. Dr. Paul writes the plan and the financial projections for you.
Construction business plan writer →Business Plan Template
For owners who want to build it themselves. A construction-specific Word plan plus an Excel model with editable bids, job costing, labor, and equipment.
Get the construction template →FAQ
Competition Questions
How can a small contractor compete with larger contractors?
How do I handle a competitor who bids much lower?
What is a good bid win rate for a contractor?
Will customers pay more for quality?
Should I specialize in one type of work?
Start with your floor. Call when you want help finding your lane.
Keep Going
Related Construction Guides
Competing well connects to bidding, customer mix, public work, moving up, and lenders.
How to Bid a Construction Job
The 8-step bid check, markup versus margin, and a walk-away number.
Customer Concentration
Measure your exposure, set a cap, and widen your base in 90 days.
Government Work
Registrations, set-asides, bonds, and wage rules before your first public bid.
Sub to General Contractor
The license path, the cash, and a safe first prime job.
What Lenders Want
The reports to bring, the SBA loan fit, and a plan that proves it.
Small Business Marketing
Get found by the customers you want to win.
Sources
Where These Numbers and Rules Come From
Every figure on this page comes from a source below. Dollar examples labeled as examples are illustrations, not projections for your business.
- ForConstructionPros: The Case for Quality and Service Over Low Bid Informal audience poll at a conference; undated.
- ProcurePro: Performance Trumps Price in Construction (Sept. 18, 2024) Vendor survey; sample size not stated.
- Louisiana DOTD: Review of Bids Received for Construction Projects (EDSM I.3.1.2) Public-sector procedure from another state; effective 2017.
- UNC School of Government: Responsible Bidder (Youens, 2009, reviewed April 2025) North Carolina source.
- BD+C: How Does Your Firm’s Hit Rate Stack Up? (Jan. 3, 2017) SMPS Foundation study of 303 firms; old data.
- Construction Dive: Contractor Backlog Jumped in September (Oct. 14, 2026)
- CBRE: North America Data Center Trends H1 2026
Dr. Paul Borosky, DBA, MBA
Business Consultant, Author & Educator | 14+ Years | 1,000+ Clients Served
Dr. Paul Borosky, DBA, MBA is a business consultant, author, and educator, and the founder of Quality Business Plan. He helps small business owners across the United States and Canada, including contractors and specialty trades, with business planning, financial modeling, fractional CFO services, and the everyday problems of businesses that depend too much on their owners. He is the creator of Dr. Paul’s Organize-Plan-Grow™ Strategy, author of numerous published books on Amazon including Top 5 Reasons Construction Companies Fail, and publisher of over 1,000 business-focused videos on YouTube.
This page is for general educational purposes only. It is not legal, financial, tax, accounting, insurance, or other professional advice. Construction laws, licensing rules, and tax rules vary by state and change over time. Dollar examples are illustrations, not projections for your business. For decisions about your own business, consult a qualified professional.